Hwy. 51 work continues

Maintenance work on Hwy. 51 between Merrill and Tomahawk will continue into early September. Crews will repair the concrete surface and resurface the interchange ramps at County K and County S; perform routine bridge maintenance on the County S overpass and apply an anti-skid surface to the bridge deck; and repave the highway shoulders.
During construction, motorists on US 51 can expect to encounter single lane closures and a reduced speed limit to 55 mph in the work zone. Some flagging operations will be necessary at the interchange ramps.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top